Types
Uses
Spillways & Outlets
Design
Building
People & Environment
Safety
Links
Arch dams
Buttress dams
Embankment dams
Gravity dams
Water supply
Hydroelectric power
Flood control
Irrigation
Navigation
Overflow spillways
Side channel spillways
Shaft spillways
Outlet towers
Compensation water
Scour
Civil engineers
Geologists
Geotechnical engineers
Hydrologists
Surveyors
Diverting the river
Preparing the foundation
Building a concrete dam
Building an embankment dam
People
Plants & animals
Sedimentation
Water quality
Historical sites
Visual Inspections
Monitor behaviour
Floods
Earthquakes
Building Dams
Back to opening page
This is a typical sequence of events for constructing a dam and creating a reservoir:
Diverting the river
Preparing the foundation for the dam
Building the dam
-
Concrete dam
-
Embankment dam
Filling the reservoir
Testing that
valves
and
floodgates
work
Monitoring the behaviour of the newly built dam
Roadford
embankment dam
under
construction in Devon, SW England